Forward Leaning Stem
The top of the wall tilts outward away from the slope. Saturated soil pushes against the stem when subgrade drainage clogs, creating uneven lateral pressure that exceeds the footing capacity. If left uncorrected, the stem fractures at the base and collapses during storm season.






